Following MARLOW NAVIGATION order in October 2017, OSS carried out the installation of an underwater plug to allow the replacement of a 20 inch valve inside the MV « BORA ».
This operation lasted 72 hours and required a careful measurement in order to make and install a plug specially adapted for this valve.
The valve has been safely replaced by the MV « BORA » crew.