Following MAHMOUDI SHIPPING order in February 2020, OSS carried out the installation of a cofferdam to allow the replacement of the speed log from the inside hull of the MV « BORA ».
This operation lasted 4 days and required a careful measurement in order to make and install a cofferdam specially adapted for a narrow place.
The Speed log has been safely replaced by the MV « CIELO DI RABAT » crew.